News

2015 STARTED WITH THE SECOND BEST JANUARY EVER
2015-02-05



The TCL handled 47,157 TEU in January, in what was the second best year start ever in the Leixões container terminal concession’s history.
Better just January 2014, for which there is now a fall of 4.5% in volume.
Positive was also the productivity achieved in the ships unloading and loading operations. On average, by every hour of effective work were performed by the ship-to-shore crane used 40 movements.
Positive was also the overall response capacity of the TCL to road carriers who required the terminal to deliver or to pick up containers. Thirty-two minutes was the average length of stay of each truck inside the port area.